2012 has gotten off to a flying start with a number of long term hire contracts in hand.
Redevelopment at Chichester College required us to provide a 15x35m demountable structure with 40mm insulated panel walling and ring beam cassette floor to act as a temporary classroom throughout the lengthy build of their new facilities. A local well known car manufacturer wanting to keep up with increasing overseas demand contracted us to provide structures to re-house their recycling plant in order to make more room in their factory for vehicle assembly.